Études de cas  /  Netherlands
Netherlands · Industrial Electronics

CNC Machined Aluminum Enclosures for a Dutch Electronics Company

An enclosure project integrating PCB alignment, connector accuracy, matched cosmetic finishing and repeatable assembly across 800 aluminum sets.

MaterialAluminum 6061-T6
Order Quantity800 Sets
Critical Tolerance±0.03 mm
Lead Time23 Days
Project Brief

From Customer Requirement to Stable Production

The enclosure body and removable cover had to fit the customer’s PCB, align with external connectors and close without visible gaps. As a customer-facing product, the sandblasted and clear-anodized exterior also required consistent color and texture.

!

Manufacturing Challenge

Thin walls, internal bosses, threaded holes and several connector openings created interdependent assembly risks. A small datum shift could affect PCB installation or external connector alignment, while separately processed covers could show visible anodizing differences.

✓

Our Engineering Solution

We reviewed the enclosure and PCB drawings together and produced a prototype for installation and connector testing. After approval, dedicated fixtures maintained a consistent datum. Bodies and covers were processed in matched batches and protected during machining, finishing and transportation.

Production Plan

How We Controlled the Process

Assembly ReviewPCB, connector and cover interfaces were reviewed together.
Prototype TestA complete set verified installation and external alignment.
Dedicated FixturesStable datums supported repeatable batch production.
Matched FinishingBodies and covers were anodized in controlled batches.
Quality Assurance

Inspection at Every Critical Stage

Inspection requirements were defined before production so dimensional, functional and cosmetic risks could be controlled throughout the order.

6061-T6 material verification
Prototype assembly test
CMM connector inspection
Thread and hole-position check
Mating-surface flatness
Color and appearance inspection
Delivered Outcome

Project Result

The prototype passed PCB, connector and cover-assembly tests before production. All 800 sets maintained consistent alignment and appearance with no reported assembly interference. The project was delivered approximately seven days ahead of the customer’s original target.